Ventilation Retrofit: Efficiency without New Construction.
Real Measurement Data
The basis for every decision is the real operating point.
Fast ROI
Transparent amortization calculation before project start.
Operational Reliability
Redundant systems and modern monitoring.
5 Steps to a Modern System
Initial Assessment
We review existing data and evaluate the potential.
Precision Measurement
Measurement of operating point & active power as current status.
Project Planning
Design of EC fans and control components.
ROI & Offer
Presentation of savings and binding offer.
Commissioning
Conversion, measurement data comparison (old/new) and documentation.
Practical Application
Industry-specific solutions for maximum energy efficiency.
Production Halls
Optimization during ongoing operation. Drastic reduction of load peaks through stepless EC control.
- Highest Availability
- Short Amortization Period
Public Buildings
- Clean Documentation
- Easy Maintenance
Refrigeration & Halls
- Reduced Noise
- CO2 Savings
Ready for the Upgrade?
Let’s jointly assess how much energy you can save. Start now with a non-binding initial assessment.